Humanihut
Humanihut
HLS-24-0001 Demo Cooper life-support pack · Deployed
Accounts · synced 9:14am Thu 15 Oct 2026
Fleet register / HLS-24-0001

HLS-24-0001

Cooper life-support pack · Hire fleet · owned by Humanihut

History
Built, allocated, shipped, deployed, returned, inspected
10 Aug, 2:00pm · Deployed
Installed at Moomba gas plant, SA · HP-26-033
5 Aug, 6:30am · Dispatched
Packed in HHCU 401682-1 and dispatched to Moomba gas plant · HP-26-033
20 Jul, 10:05am · Allocated
Allocated to HP-26-033 — Santos — Cooper Basin · HP-26-033
17 Feb, 3:00pm · Built
Built at Tonsley
Status
Deployed
Location
Moomba gas plant, SA
Project
HP-26-033
Santos — Cooper Basin — Moomba crew overflow camp — 2 × The Cooper (Operational)
Container
HHCU 401682-1
Pool
Hire fleet
Owner
Humanihut
Built
17 Feb 2024
Deployments
4
Last inspection
13 Aug 2026
Next inspection
13 Aug 2027
Condition
Good
Hire rate
$850 / week

Power generator · 2 × freshwater tanks · 2 × wastewater tanks · macerator pumps · electrical