Quotes / Q-26-0110
Ascension Island personnel accommodation — stage 2
Q-26-0110 · Mitie Group plc — UK MoD Defence · Sale · Won
Humanihut Pty Ltd — Field Infrastructure Systems
290 Glen Osmond Road, Fullarton SA 5063 · Factory: Tonsley SA
+61 436 965 586 · sales@humanihut.com · humanihut.com
ABN 71 163 752 994 · ISO 9001 · ISO 14001 · ISO 45001
290 Glen Osmond Road, Fullarton SA 5063 · Factory: Tonsley SA
+61 436 965 586 · sales@humanihut.com · humanihut.com
ABN 71 163 752 994 · ISO 9001 · ISO 14001 · ISO 45001
Quotation
Q-26-0110
20 Jul 2026
Valid until 19 Aug 2026
Proposed start 17 Aug 2026
Prepared for
Mitie Group plc — UK MoD Defence
Alistair Gough, Programme Director — South Atlantic
Level 12, 2 Harbour Exchange, London
ABN GB 211 4567 83
Level 12, 2 Harbour Exchange, London
ABN GB 211 4567 83
Scope
Supply of 24 × 6m Hut for Ascension Island (South Atlantic) — accommodation for up to 192 personnel.
| Description | Qty | Unit | Amount |
|---|---|---|---|
| 6m Hut — supply | 24 | $46,500.00 | $1,116,000.00 |
| Bathroom module — supply | 2 | $64,000.00 | $128,000.00 |
| Packing, containerised freight and delivery to site | 1 | $168,000.00 | $168,000.00 |
| Installation supervision and commissioning | 1 | $64,000.00 | $64,000.00 |
| Subtotal ex GST | $1,476,000.00 | ||
| GST 10% | $147,600.00 | ||
| Total incl GST | $1,623,600.00 | ||
Terms
30% deposit on order, 40% on completion of manufacture at Tonsley, 30% on delivery to site. Units carry Humanihut's structural warranty and a 20+ year design life. Payment terms 45 days.
Brendan Tucker · General Manager EMEA · Humanihut
Internal — not on the quote
- Value
- $1,476,000
- Cost
- $938,712
- Margin
- 36.4% $537,288
- Owner
- Brendan Tucker
- Status
- Won