Work orders / WO-26-0125
8 × 6m Hut
WO-26-0125 · HP-26-030 — Fortescue — Iron Bridge — 16 Huts · lead Dan Moretti
Stage
Complete
parts issued 25 May
Completed
12 Jun
started 25 May
Materials
$201,368
$234,968 standard incl. labour
Short parts
0
all issued
Bill of materials
8 × 6m Hut — issued from stock
| Part | Description | Per unit | Needed | On hand | Status | Cost |
|---|---|---|---|---|---|---|
| HH-P-WP01 | Folding wall panel 2.3 m — fire-rated insulated, Colorbond Surfmist | 8 | 64 ea | 280 | Issued | $40,960.00 |
| HH-P-RP01 | Roof panel 5.8 m — insulated, Colorbond Surfmist | 4 | 32 ea | 190 | Issued | $24,960.00 |
| HH-P-FC01 | Floor cassette 2.9 m — insulated, vinyl finish | 2 | 16 ea | 110 | Issued | $18,400.00 |
| HH-P-EP01 | End wall panel — door opening | 1 | 8 ea | 52 | Issued | $7,120.00 |
| HH-P-EP02 | End wall panel — window opening | 1 | 8 ea | 50 | Issued | $6,560.00 |
| HH-S-BF01 | Galvanised base frame 5.8 m | 1 | 8 ea | 44 | Issued | $11,840.00 |
| HH-S-LG01 | Adjustable levelling leg (±150 mm) | 8 | 64 ea | 520 | Issued | $2,944.00 |
| HH-H-FH01 | Fold hinge assembly — 316 stainless | 16 | 128 ea | 900 | Issued | $7,424.00 |
| HH-H-SL01 | Integrated fold seal — EPDM | 24 | 192 m | 1,600 | Issued | $2,784.00 |
| HH-H-GK01 | Perimeter gasket kit — Hut | 1 | 8 kit | 60 | Issued | $1,480.00 |
| HH-H-FK01 | Fastener kit — Hut | 1 | 8 kit | 70 | Issued | $1,136.00 |
| HH-H-CL01 | Click-and-connect coupler | 4 | 32 ea | 260 | Issued | $3,072.00 |
| HH-W-DG01 | Double-glazed window 900 × 600 — aluminium frame | 2 | 16 ea | 58 | Issued | $7,440.00 |
| HH-W-DR01 | Insulated entry door set — keyed | 1 | 8 ea | 46 | Issued | $9,920.00 |
| HH-E-AC01 | Reverse-cycle split system 3.5 kW | 1 | 8 ea | 26 | Issued | $13,520.00 |
| HH-E-LD01 | LED batten 1.2 m — IP65 | 4 | 32 ea | 290 | Issued | $1,536.00 |
| HH-E-SD01 | Interlinked smoke alarm — 240 V, RF | 2 | 16 ea | 140 | Issued | $992.00 |
| HH-E-LM01 | Electrical loom — Hut, pre-terminated | 1 | 8 ea | 44 | Issued | $4,160.00 |
| HH-E-DB01 | Distribution board 4-pole with RCBOs | 1 | 8 ea | 50 | Issued | $2,480.00 |
| HH-E-GP01 | Double GPO with USB | 3 | 24 ea | 150 | Issued | $912.00 |
| HH-E-PL01 | Inter-Hut power lead 15 A | 1 | 8 ea | 48 | Issued | $688.00 |
| HH-F-BD01 | Bunk bed frame — steel, single over single | 4 | 32 ea | 170 | Issued | $12,640.00 |
| HH-F-MT01 | Mattress — single, fire-retardant | 8 | 64 ea | 300 | Issued | $10,560.00 |
| HH-F-LK01 | Locker — 2-door steel | 2 | 16 ea | 90 | Issued | $4,960.00 |
| HH-K-PF01 | Packing frame / stillage — Hut | 1 | 8 ea | 40 | Issued | $2,880.00 |
| 25 lines | $201,368.00 | |||||
Serials built
8 units minted into the fleet register
- Product
- 6m Hut
- Quantity
- 8
- For
- HP-26-030
- Priority
- Normal
- Start
- 25 May 2026
- Due
- 15 Jun 2026
- Raised
- 11 May 2026
5.8 × 2.3 × 2.3 m · 13.35 m² · folding wall system with integrated seals · reverse-cycle air conditioning · double-glazed windows · LED lighting · interlinked smoke detection
On the line
ScheduleNot on the schedule.